mailto:uumlib@uum.edu.my 24x7 Service; AnyTime; AnyWhere

Improvement material inventory tracking for maintenance and project through lean sigma methodology

Manurung, Sotarduga (2014) Improvement material inventory tracking for maintenance and project through lean sigma methodology. In: 4th International Conference on Technology and Operations Management (ICTOM04), 18-19 August 2014, Kuala Lumpur, Malaysia.

[thumbnail of P48.pdf]
Preview
PDF
Download (527kB) | Preview

Abstract

A material management is one of the key issues in ensuring that a project can be completed timely and safely.Well Development project is one of the CVX main projects that were performed to maintain oil production in order to support National income of Government of Indonesia.As one of the project resources, material inventory is a point that needs to be managed very well.The purpose of this paper is to present a Lean Sigma case study for reducing surplus materials.Due to lack of monitoring and poor material management system, project team facing that surplus material reaches $3.2 MM.Lean sigma became a very popular as it provides the organization the desired speed with quality.An initiative was done to improve project team performance. An application of Lean Sigma methodology is applied on to reduce surplus materials of project and maintenance.By having this Lean Sigma project, the surplus material can be reduced to $ 2.29 MM.

Item Type: Conference or Workshop Item (Paper)
Additional Information: Organized by: School of Technology Management and Logistics, Universiti Utara Malaysia, Prince of Songkla University (PSU) & Institut Teknologi Bandung.
Uncontrolled Keywords: Lean Sigma, Material handling, Inventory level, Materials process flow, Surplus Materials
Subjects: T Technology > TS Manufactures
Divisions: School of Business Management
Depositing User: Mrs. Norazmilah Yaakub
Date Deposited: 28 Oct 2015 01:18
Last Modified: 18 Apr 2016 02:31
URI: https://repo.uum.edu.my/id/eprint/15993

Actions (login required)

View Item View Item