mailto:uumlib@uum.edu.my 24x7 Service; AnyTime; AnyWhere

A study of manpower issues in project management

Lim, Hui Mui and Tan, Poh Yeng and Tan, Pui San and Mohd Nawi, Mohd Nasrun (2013) A study of manpower issues in project management. In: Simposium Pengurusan Teknologi, Operasi & Logistik (SIPTIK IV), 14-16 Mei 2013, Foyer Perpustakaan Sultanah Bahiyah UUM.

[thumbnail of p286.pdf] PDF
Restricted to Registered users only

Download (337kB) | Request a copy

Abstract

This article is about factors of manpower issue in project management that affect the project running.Lacking of manpower will delay or suspend the progress of a project.The cause of lacking manpower can be ranged from base workers until the top management board of a company.Thus we need to minimize project delays and make recommendations for effective projects.We distributed 25 sets of survey questionnaires for data collection and do data analysis by calculating Relative Importance Index (RI).The result shown that contractor factor occupied the largest capacity among all factors.

Item Type: Conference or Workshop Item (Paper)
Additional Information: Penyunting Fadhilah Mat Yamin, Noorulsadiqin Azbiya Yaacob, Chong Khai Lin, Faizatul Akmar Abdul Nifa & Suria Musa. e-ISBN 978-983-2078-77-7 Anjuran Pusat Pengajian Pengurusan Teknologi dan Logistik (STML) dengan kerjasama Pusat Kerjasama Universiti-Industri (CUIC) Diterbitkan oleh: Universiti Utara Malaysia 06010 UUM Sintok, Kedah MALAYSIA
Uncontrolled Keywords: Manpower, Delay, Contractor, Construction Industry
Subjects: T Technology > TH Building construction
Divisions: College of Arts and Sciences
Depositing User: Dr. Sr. Mohd Nasrun Mohd Nawi
Date Deposited: 18 Aug 2014 02:22
Last Modified: 18 Aug 2014 02:22
URI: https://repo.uum.edu.my/id/eprint/11671

Actions (login required)

View Item View Item