Mohd Nawi, Mohd Nasrun and Baluch, Nazim Hussain and Omar, Mohd Faizal (2013) Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects. In: 3rd International Building Control Conference (IBCC), 21st November 2013, Royal Chulan Hotel, Kuala Lumpur, Malaysia. (Unpublished)
PDF
Restricted to Registered users only Download (1MB) | Request a copy |
Abstract
Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and inefficiency. Team integration is perceived as paramount. Unfortunately,there are limited numbers of studies that focus on the dimension of full IBS projects.Accordingly, this paper explores and identifies the dimension of fully integrated team from the traditional approach and conducts a validation process for implementing it in Malaysian IBS projects.The research presented uses interviews case study to obtain qualitative data.It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Industrialised building system(IBS); Malaysian construction industry; dimension of fully integrated team |
Subjects: | T Technology > TH Building construction |
Divisions: | College of Arts and Sciences |
Depositing User: | Dr. Sr. Mohd Nasrun Mohd Nawi |
Date Deposited: | 23 Jul 2014 02:36 |
Last Modified: | 23 Jul 2014 02:36 |
URI: | https://repo.uum.edu.my/id/eprint/11747 |
Actions (login required)
View Item |