Mohammad Asri, Mohammad Azwanie Naim and Mohd Nawi, Mohd Nasrun (2015) Actualizing lean construction: Barriers toward the implementation. Advances in Environmental Biology, 9 (5). pp. 172-174. ISSN 1995 - 0756
Preview |
PDF
Available under License Attribution 4.0 International (CC BY 4.0). Download (339kB) | Preview |
Abstract
Lean thinking has been regarded as a success strategy in mass production, realizing cost and time saving while simultaneously improving competitive position in the market.It also can be interpret as a philosophy based on the concept of lean manufacturing.It is about managing and improving the construction process to profitably deliver what the customer need. Despite all the benefits that can be gained by implementing the idea of lean construction, all industry player need to consider the barriers obstructing its application.Through a review of a literature there are numbers of barrier that can be identified. The barriers toward the implementation are discussed in this paper.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | barriers, lean construction |
Subjects: | T Technology > TH Building construction |
Divisions: | School of Technology Management & Logistics |
Depositing User: | Dr. Sr. Mohd Nasrun Mohd Nawi |
Date Deposited: | 10 May 2015 08:53 |
Last Modified: | 17 Apr 2016 00:34 |
URI: | https://repo.uum.edu.my/id/eprint/13879 |
Actions (login required)
View Item |