Mohammad Asri, Mohammad Azwanie Naim and Mohd Nawi, Mohd Nasrun and Saad, Rohaizah and Osman, Wan Nadzri and Anuar, Herman Shah (2016) Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review. Advanced Science Letters, 22 (5). pp. 1593-1596. ISSN 1936-6612
PDF
Restricted to Repository staff only Download (411kB) | Request a copy |
Abstract
Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute to the knowledge and addressing the logistical issues in IBS and integrating lean construction to tackle that particular issue. The literature review has been conducted through relevant database.It was found that there is a need for more holistic approaches to be adopted in JIT implementation in Industrialized Building System (IBS) project.IBS were well known for the cost saving benefit that can be derived from the implementation of the system, but logistical problem during the performance of the project can affected the profit of the project which later may consume the benefit of cost reduction made on site. Suggestion on how JIT can contribute for improving the construction logistic management process in order to enhance IBS uptake in Malaysian construction projects will be concluded.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Lean Construction, Just in time, Industrialized Building System, Malaysian Construction Industry |
Subjects: | T Technology > TH Building construction |
Divisions: | School of Technology Management & Logistics |
Depositing User: | Dr. Sr. Mohd Nasrun Mohd Nawi |
Date Deposited: | 15 Nov 2016 02:36 |
Last Modified: | 15 Nov 2016 02:36 |
URI: | https://repo.uum.edu.my/id/eprint/19505 |
Actions (login required)
View Item |