mailto:uumlib@uum.edu.my 24x7 Service; AnyTime; AnyWhere

Key factors of readiness in the implementation of Industrialised Building System (IBS)

Tamrin, Norhidayah and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar (2016) Key factors of readiness in the implementation of Industrialised Building System (IBS). In: 2016 International Conference on Applied Science and Technology (ICAST 2016), 11–13 April 2016, Kedah, Malaysia.

[thumbnail of ICAST’16 1 7.pdf] PDF
Restricted to Repository staff only

Download (456kB) | Request a copy

Abstract

Although IBS has been introduced since the 1960, and many advantages that have identified for the implementation of IBS in Malaysia, yet the level of implementation of IBS still did not achieve the government target.Previous studies have been conducted to identify the factors that contribute to the lack of the implementation.From the previous studies, mostly the barriers of IBS implementation are rooted within the several semi-structured lack of readiness among industry players.The interview participants for this study are from the multidisciplinary IBS practitioners. This paper discusses the identified readiness with the objective to determine what the key factor of readiness in IBS implementation is and how far the factors influence the IBS activities.From the finding, the readiness factor was divided into three main factors which are knowledge, ability and planning.

Item Type: Conference or Workshop Item (Paper)
Subjects: T Technology > TH Building construction
Divisions: School of Technology Management & Logistics
Depositing User: Dr. Sr. Mohd Nasrun Mohd Nawi
Date Deposited: 15 Nov 2016 06:04
Last Modified: 15 Nov 2016 06:04
URI: https://repo.uum.edu.my/id/eprint/19552

Actions (login required)

View Item View Item