UUM Repository | Universiti Utara Malaysian Institutional Repository
FAQs | Feedback | Search Tips | Sitemap

Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia


Long, Rozita and Mohtar, Shahimi and Ahmad, Fakhrorazi (2016) Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia. International Journal of Modern Engineering Research (IJMER), 6 (10). pp. 15-20. ISSN 2249–6645

[img] PDF
Restricted to Registered users only

Download (299kB) | Request a copy

Abstract

Aerospace industry is a high cost and high technology base operations.Every minute and seconds count as cost is getting higher with longer time taken to complete the product and deliver to customer.On time delivery is the key performance in the aerospace industry be it service or manufacturing.An aerospace organization (service or manufacturing) must manage its resources and capabilities to achieve and sustain the on time delivery.This article is to provide a literature reviews of the on time delivery processes in an aerospace manufacturing company in Malaysia from a Resource Based View perspective. This review will be an input to the aerospace manufacturing company and aerospace industry in Malaysia as an optional strategy in managing resources and capabilities in order to meet and sustain the on time delivery.

Item Type: Article
Uncontrolled Keywords: On Time Delivery, Resource Based View Theory, Resource, Capability
Subjects: T Technology > TS Manufactures
Divisions: School of Technology Management & Logistics
Depositing User: Prof. Madya Dr. Shahimi Mokhtar
Date Deposited: 06 Jun 2017 02:53
Last Modified: 06 Jun 2017 02:53
URI: http://repo.uum.edu.my/id/eprint/22260

Actions (login required)

View Item View Item