mailto:uumlib@uum.edu.my 24x7 Service; AnyTime; AnyWhere

Improvement in Ship Repair Works: Experience in Implementation of Production Friendly Drawing in Shipyard

Yasin, Mazlan and Osman, Nor Hasni (2018) Improvement in Ship Repair Works: Experience in Implementation of Production Friendly Drawing in Shipyard. International Journal of Supply Chain Management (IJSCM), 7 (1). pp. 163-169. ISSN 2050-7399

[thumbnail of IJSCM  7 1  2018  163 139.pdf] PDF
Restricted to Registered users only

Download (160kB) | Request a copy

Abstract

This paper is about studied the conflicts within the Production Department where ship repair works are carried out without proper establishment and full utilization of Production Friendly Drawing (PFD) produced by the Engineering Department. In order to resolve this problem, the qualitative study method was conducted in the shipyard to propose the best solution to overcome this issue. Production need to utilize the PFD to ensure ship repair works perform in accordance with “best engineering practice” while designer in Engineering Department must ensure the production drawing produced is friendly enough and accurate. PFD as one of the conflict resolution is chosen to overcome this issue while qualitative as a method being deploying to engage the production and designer intervention to come out with more efficient and effective solution for this problem. There are two findings have been discussed and compared in which the conclusion of the result was very significant.

Item Type: Article
Uncontrolled Keywords: Production Friendly Drawing, Conflict Resolution, Communication, Qualitative study, Korean Best Practice
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Othman Yeop Abdullah Graduate School of Business
Depositing User: Mrs. Norazmilah Yaakub
Date Deposited: 18 Jul 2018 06:14
Last Modified: 18 Jul 2018 06:14
URI: https://repo.uum.edu.my/id/eprint/24417

Actions (login required)

View Item View Item