Mohd Nawi, Mohd Nasrun and Lee, Angela and Noor, Mohamed and Azman, Azhari and Mohamad Kamar, Kamarul Anuar (2014) Fragmentation issue in Malaysian Industrialised Building System (IBS) projects. Journal of Engineering Science and Technology, 9 (1). pp. 97-106. ISSN 1823-4690
PDF
Restricted to Registered users only Download (385kB) |
Abstract
As a developing country, Malaysian is currently driving for implementing a new or modern construction method, the Industrialis ed Building System (IBS),as an alternative towards enhancing construction performance. Currently, most of the IBS project developments in Malaysia are still conducted by using the traditional construction process approach.This traditional construction process has been widely criticised for its fragmented approach to project delivery and its failure to form effective teams thus created a numb er of issues such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to highlight this fragmentation issue and clarify how far it affects the process of IBS implementation. Suggestions on how an integrated approach in design and construction in order to minimise the fragmentation gaps will be concluded.
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Industrialised building system (IBS), Fragmentation, Integrated team practice, Malaysia construction industry. |
Subjects: | T Technology > TH Building construction |
Divisions: | School of Technology Management & Logistics |
Depositing User: | Dr. Sr. Mohd Nasrun Mohd Nawi |
Date Deposited: | 21 Apr 2014 00:30 |
Last Modified: | 18 Apr 2016 03:08 |
URI: | https://repo.uum.edu.my/id/eprint/10608 |
Actions (login required)
View Item |