mailto:uumlib@uum.edu.my 24x7 Service; AnyTime; AnyWhere

Browse by People

Number of items: 6.

Ahmad Pozin, Mohd Affendi and Mohd Nawi, Mohd Nasrun and Lee, Angela and Yaakob, Mazri and Hanafi, Mohd Hanizun (2018) A Cause of Communication Failure in Managing Industrialized Building System (IBS) Projects: A Perspective View from Project Managers. International Journal of Technology, 9 (8). pp. 1523-1532. ISSN 2086-9614

Hanafi, Mohd Hanizun and Abdul Razak, Arman and Abdullah, Shardy and Ismail, Radzi and Mohd Nawi, Mohd Nasrun (2015) Contributing factors of steel formwork usage in Malaysian construction industry: Housing scheme. Advances in Environmental Biology, 9 (3). pp. 130-132. ISSN 1995 - 0756

Hanafi, Mohd Hanizun and Farrell, Peter and Yusoff, Mohd Nazaruddin and Abdullah, Shardy and Abdul Razak, Arman (2017) Installation systems of on-site prefabricated concrete components: a qualitative approach. International Journal of Construction Management, 18 (5). pp. 343-350. ISSN 1562-3599

Mohd Nawi, Mohd Nasrun and Osman, Wan Nadzri and Baharum, Mohd Faizal and Hanafi, Mohd Hanizun (2012) Kajian baseline sistem binaan bangunan berindustri (IBS): perspektif pemaju perumahan negeri Kedah dan Perlis. Journal of Technology and Operations Management, 7 (2). pp. 70-80. ISSN 1823-514X

Mohd Nawi, Mohd Nasrun and Mydin, Md Azree Othuman and Nursal, Ahmad Taufik and Abdul Nifa, Faizatul Akmar and Hanafi, Mohd Hanizun (2015) Payment issues in Malaysia Industrialised Building System (IBS): A research framework. Advances in Environmental Biology, 9 (4). pp. 88-91. ISSN 1995 - 0756

Yaakob, Mazri and Mohd Nawi, Mohd Nasrun and Ibrahim, Amlus and Hanafi, Mohd Hanizun (2014) A propose study of developing Building Information Modelling (BIM) framework in the Malaysian construction industry. In: Knowledge Management International Conference 2014 (KMICe2014), 12-15 August 2014, Langkawi, Malaysia.

This list was generated on Sun Dec 22 11:38:16 2024 +08.