Seng, Hock Sing and Saw, Hoay Ping and Tan, Poh See and Mohd Nawi, Mohd Nasrun and Osman, Wan Nadzri (2013) The issues of delay in construction project. In: Simposium Pengurusan Teknologi, Operasi & Logistik (SIPTIK IV), 14-16 Mei 2013, Foyer Perpustakaan Sultanah Bahiyah UUM.
![]() |
PDF
Restricted to Registered users only Download (186kB) | Request a copy |
Abstract
The lack of completed and effective work schedule in the construction project causes conflicts at construction progress.As a result, project to be delayed.In Malaysia, the majorities attitudes of contractors are less emphasize to prepare work schedule.Thus, projects involved will over commit construction materials and human resources. From issue above, there is a need to study the techniques of work schedule for monitoring progress.With a case study provided, its findings focus on the necessity of prepare work schedule.After there has an adding work schedule, many construction phases run smoothly and construction resource also to be used wisely.
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Additional Information: | Penyunting Fadhilah Mat Yamin, Noorulsadiqin Azbiya Yaacob, Chong Khai Lin, Faizatul Akmar Abdul Nifa & Suria Musa. e-ISBN 978-983-2078-77-7 Anjuran Pusat Pengajian Pengurusan Teknologi dan Logistik (STML) dengan kerjasama Pusat Kerjasama Universiti-Industri (CUIC) Diterbitkan oleh: Universiti Utara Malaysia 06010 UUM Sintok, Kedah MALAYSIA |
Uncontrolled Keywords: | conflicts, project to be delayed, attitudes of the contractors, prepare work schedule, over commit resource |
Subjects: | T Technology > TH Building construction |
Divisions: | College of Arts and Sciences |
Depositing User: | Dr. Wan Nadzri Osman |
Date Deposited: | 18 Aug 2014 07:43 |
Last Modified: | 18 Aug 2014 07:43 |
URI: | https://repo.uum.edu.my/id/eprint/11698 |
Actions (login required)
![]() |
View Item |