mailto:uumlib@uum.edu.my 24x7 Service; AnyTime; AnyWhere

A Strategy towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects

Othman, Mohd Zainudin and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar and Yaakob, Mazri and Rofie, Mohamad Khadafi and Md Zan, Zainal and Ahmad Pozin, Mohd Affendi (2016) A Strategy towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects. International Review of Management and Marketing, 06 (S8). pp. 226-229. ISSN 2146-4405

[thumbnail of IRMM 06 S8 226-229 2016.pdf]
Preview
PDF - Published Version
Available under License ["licenses_description_cc4_by_nc_nd" not defined].

Download (290kB) | Preview

Abstract

The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and dependency on manual foreign labor, and (4) achieve the ultimate goal of reducing the overall cost of construction. Despite acknowledging its benefits, the construction industry is still not rapidly embracing IBS. This is mainly due to its traditional and conservative nature where anything new or different, faces implementation barriers. An investigation by some researchers identified that one of the main obstacles to IBS implementation in the Malaysian construction industry is related to poor integration among stakeholders involved during the design stage. Responding to the issue above, this research aims to counter this problem and help towards the betterment of the IBS Malaysian construction industry using an integrated design team delivery approach. Therefore, this paper discusses a strategy by the identifying key factors that are pertinent to improving the integration of design and construction activities and summarizes the recommendations from multiple case studies on the key factors towards effective integrated design team delivery

Item Type: Article
Uncontrolled Keywords: Industrialized Building System, Integration, Integrated Practiced,
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: School of Technology Management & Logistics
Depositing User: Mr. Izhar Hj. Hashim
Date Deposited: 02 Jan 2025 11:32
Last Modified: 02 Jan 2025 11:32
URI: https://repo.uum.edu.my/id/eprint/31733

Actions (login required)

View Item View Item