Ahmarofi, Ahmad Afif and Abidin, N. Z. and Ramli, Razamin (2017) Effect of Manpower Factor on Semiautomatic Production Line Completion Time: A System Dynamics Approach. Journal of Mechanical Engineering and Sciences, 11 (2). pp. 2567-2580. ISSN 2289-4659
Preview |
PDF (https://journal.ump.edu.my/jmes/about)
- Published Version
Available under License ["licenses_description_cc4_by_nc_nd" not defined]. Download (1MB) | Preview |
Abstract
Completion time in a manufacturing sector is the time required to complete a product in sequence process during production operation. In a semiautomatic production line, manpower factors such as fatigue and pressure are two significant influences on completion time. However, it is found that previous studies lack the concern to include manpower factor in completion time. Hence, this paper develops a causal loop diagram and stock flow diagram to simulate the influence of manpower factor on the completion time in a semiautomatic production line. In this research, a well-known audio speaker manufacturer is selected as a case company. As a result, it is found that the preparation time for materials has a great impact on fatigue and pressure as it contributes the highest percentage of deviation from the completion time base run with 72.22%. Finally, a policy regarding completion time improvement is recommended to the management to enhance their production performance
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Causal loop diagram; stock flow diagram; system dynamics; completion time; semiautomatic production line |
| Subjects: | Q Science > QA Mathematics |
| Divisions: | School of Quantitative Sciences |
| Depositing User: | Mdm. Sarkina Mat Saad @ Shaari |
| Date Deposited: | 04 Jul 2024 03:48 |
| Last Modified: | 04 Jul 2024 03:48 |
| URI: | https://repo.uum.edu.my/id/eprint/31022 |
Actions (login required)
![]() |
View Item |
Dimensions
Dimensions