Tamrin, Norhidayah and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar (2016) Readiness in Knowledge and Ability for Implementation of Industrialised Building System (IBS) In Malaysian Construction Industry. Rev. Téc. Ing. Univ. Zulia., 39 (9). pp. 47-53.
|
PDF
- Published Version
Restricted to Registered users only Download (263kB) | Request a copy |
Abstract
This study explores the key factors of readiness in implementation of Industrialised Building System (IBS) in Malaysian Construction Industry. Previous studies pointed out that readiness issues are one of the barriers in implementation of IBS. Readiness is a preparation for something, or willing and able to do something which is a very important criteria to make the successfull of the changes process from traditional method to IBS. Therefore, this study was conducted to come out with the factor that influenced readiness in implementation of IBS. In this study, interview was selected as research technique in data collection process and there are four interview participant, which is from multidisciplinary IBS practitioner. The result show that the readiness in knowledge and ability are the most important aspect that should be highlighted before implement IBS
| Item Type: | Article |
|---|---|
| Uncontrolled Keywords: | Readiness, Industrialised Building System (IBS), Malaysian Construction Industry |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
| Divisions: | School of Technology Management & Logistics |
| Depositing User: | Mr. Izhar Hj. Hashim |
| Date Deposited: | 17 Dec 2024 13:54 |
| Last Modified: | 08 Jan 2025 05:08 |
| URI: | https://repo.uum.edu.my/id/eprint/31633 |
Actions (login required)
![]() |
View Item |